Thursday, October 1, 2009

(as good as) Done

Here we are then just before it gets installed on the layout and bedded in. The main building. I'm pretty pleased with it so far. Once I get it in situ I'll then add a bit of light weathering to it.
To recap on the construction methods and materials used. The main building shell is 5mm foamcore board. The brick base came from some leftover parts of a Walthers low relief building kit The block walling was hand scribed styrene sheet. The doors are left overs from some other Walthers and Pikestuff kits. The Biffy is from BLMA. The Lean-to addition is a shell of 1.5mm card from the back of a desk top calendar faced with Metal roof and siding embossed styrene sheets.
Time for a coffee break I think.

No comments:

Post a Comment